NEW ICS FOOD BANK

The new 2,700-square-foot Food Bank is under construction! Thank you for your support...we couldn't do it without you.

We'll post pictures as construction moves along. Check back often!

Old shed coming down

Old storage shed coming down (7-5)

Construction begins

Construction begins (7-6)

Early morning concrete

Pouring concrete at dawn (7-20)

Slab

That's a lot of concrete! (7-20)

Smoothing concrete

Smoothing out the concrete (7-20)

Walk-in refrig area

Walk-in refrigerator area (7-20)

Framing

Frame going up!! (7-22)

Framing

Roof going up today!! (8-2)

Sheathing

Sheathing going on (8-4)

Inside walls

Putting up walls inside (8-9)

Preparing for stucco

Preparing for stucco (8-12)

Taking shape

It's taking shape! (8-12)

Hard hat sign

Did someone say hard hat?? (8-23)

Progress inside

Progress inside (8-23)

Inside work

More work inside (8-23)

Backhoe

Need a lift? (8-26)

Stucco

Stucco-you! (8-26)

Steps coming out

Tearing out steps at old Food Bank (8-26)

New steps

New steps at current building that will be part of the walkway between old and new buildings (8-30)

Excavation

Excavation for walkway between buildings (8-30)

Windows and doors Windows and doors going in (8-31)

Paint

Beautiful desert tan paint to match existing main office (9-1)

Blue door Blue entrance door (9-15)

Freezer & sink Freezers and sink (9-16)

WorkersHappy workers...almost done! (9-16)

Walkway New walkway (9-20)